JIS G3461 STB410 boiler tubes are mainly used to make superheater tubes, reheater tubes, gas guide tubes, main steam tubes, etc. of high-pressure and ultra-high-pressure boilers.
The chemical composition of STB410 seamless tubes includes C not more than 0.32%, Si not more than 0.35%, Mn between 0.30~0.80%, P and S not more than 0.035%.
The tensile strength (σb) of JIS G3461 STB410 seamless boiler tubes is not less than 410MPa, the yield strength (σs) is not less than 255MPa, and the elongation (δ) varies with the diameter (D) of the pipe section. Specifically, when D Greater than or equal to 20 and S Greater than or equal to 8mm, the elongation (δ) is not less than 25%; when D<10, the elongation (δ) is not less than 17%.
JIS G3461 STB410 Hot rolled seamless pipes are delivered in hot rolled state, low temperature annealing or normalized state; cold drawn seamless pipes are delivered in low temperature annealing, normalized or fully annealed state; welded pipes are delivered in normalized state.
| JIS G3461 STB340 Carbon Steel Boiler and Heat exchanger Tubes | ||
| STB340, STB410, STB510 | ||
| With Hydraulic Testing, Ultrasonic testing or X-ray Test | ||
| ISO9001;2015 | ||
| Less Than 15/20/25/30/40/50/60 Days According To The Quantity | ||
JIS G3461 STB410 heat exchanger tubes

GNEE operates on the principle of "integrity-based, customer first". With the best quality, lowest price and most complete after-sales service, our products are exported to more than 60 countries and regions including Russia, Canada, India, Brazil and Southeast Asia.



Q.What is your after-sales service?
A.We provide after-sales service and 100% quality assurance for our products.
A.Delivery time is usually about 1 month, if we have stock, we can ship within 7 days.
Kuum tags: jis g3461 stb410 high pressure boiler tube, China jis g3461 stb410 high pressure boiler tube manufacturers, suppliers, factory



